image image Electricians Advice Needed! I've got a new meter base Milbank u derground service) and a new mains panel (Square D QO). Both are ground neutral bonded. Where should the ground electrode (ground rod) conductor be connected, the main panel or the meter socket? #asknostr #electricity #electrician #nec
2025-09-13 22:19:07 from 1 relay(s) 3 replies ↓
Login to reply

Replies (5)

I would bond it outside personally.. But depends where you are maybe whether the inspector is okay with the sub being nuetral bonded. When I said both I was thinking like a continuois loop through the meter to the other panel.